Loading
Loading
The rules
Purchases made under the federal supply schedules must be of products from the United States or from countries the relevant trade agreements designate. A device substantially transformed in a non-designated country cannot be sold on those vehicles, and the answer turns on where substantial transformation occurred rather than where final assembly or packaging happened.
01In full
Substantial transformation is the operative test: the country where the article became a new and different article of commerce, with a name, character or use distinct from its components. That is frequently not the country on the shipping label, and it is a determination your regulatory and trade-compliance people should make, not your commercial team.
The designated-country list is long and includes most of the manufacturing base a device company is likely to use. The list is published and it changes, so a determination made three years ago is worth re-checking rather than assumed.
Where a component is sourced in a non-designated country but the device is substantially transformed elsewhere, the device can still qualify. Where final packaging happens in a designated country but the transformation did not, it does not.
This is separate from domestic-preference rules that apply to other kinds of federal purchase. Getting the two confused produces confident, wrong answers in both directions.
You do, and you certify it. The contracting officer relies on the certification, which is why a careless answer here is a compliance exposure rather than a paperwork detail.
It applies where the trade agreements are incorporated, which covers the schedule vehicles. Other purchase types may be governed by different origin rules, and the analysis has to be done per vehicle rather than once for the company.
Everything on this page is public record. Quartermaster never files anything on your behalf — any document the product generates is a draft, and the portal that accepts the real one is linked from it.
02Your case
Five questions, about ninety seconds, no signup. You get a verdict per channel, the specific things blocking you, and — if a partner is the answer — which register-flagged firms could carry your category.
How this fits together
It told you whether the door is open, and it cost nothing because that answer is worth nothing on its own — everything that follows depends on what you actually make and who is already selling it there. That is the next rung, and the one after it is the same machinery with no document in the way.
The difference between these is cadence, not depth. A report is an answer on a date; a subscription is the machinery that produced it, pointed wherever you like.
Once, in about ninety seconds
Free, no signup
You do not yet know whether the federal channel is open to you at all.
One answer, on one date, as a document you keep
$950–$10,000
You have a decision in front of you now and need it answered once, with citations you can hand to someone else.
See the reportsThe same report, four times a year
$2,375–$6,250 a year
The answer has a clock in it — an expiry, a fiscal year, a recompete — and being current matters more than being early.
See which reports standAsk it yourself, whenever, across the channel
$5,000 a year and up
You are asking more than a couple of these questions a quarter, or the next question depends on the last one's answer.
See the tiersA report is not a sunk cost
Whatever you spend on a report comes off your first year if you subscribe within 90 days — up to 25% of it. One per customer. If you never subscribe you keep the report and owe nothing further: it is a deliverable, not a deposit.