Loading
Loading
The calendar
Federal buying runs on a calendar that repeats. Knowing its shape is the difference between arriving while a decision is open and arriving after it closed — and almost everything that matters happens months before the date a newcomer is watching.
Everything below is a recurring rule. There is not one specific date on this page, because a specific date belongs to a specific contract — and which awards in your product-service codes are in their notice window right now is what the product answers.
01The year
1 October
New appropriations become available. Early in the year, buyers have money and time, which is when a genuinely new device gets evaluated rather than slotted in. It is the worst time to expect an urgent decision and the best time to start one.
Through the winter
This is where a contracting officer decides whether two verified firms could offer, whether an existing vehicle covers the need, and what the acquisition looks like. Responding to a sources-sought notice matters more here than anywhere else on this page, and almost nobody does it.
The rule behind itRoughly 60 to 90 days before an option period ends
The standard option clause requires the government to give written notice of intent to extend before the current period runs out. That window — not the expiry date — is when an incumbent is genuinely testable and when a challenger still has time to matter.
The rule behind itSpring into early summer
Working backwards from a 30 September obligation deadline, an acquisition that needs a real competition has to be on the street by now. If you are hearing about a requirement for the first time in August, you are hearing about someone else's win.
30 September
Most operating money is available for obligation during the fiscal year and is lost if not committed. The pressure is real and it is selective: what moves is what can be executed quickly, which means purchases riding a vehicle that already has pricing in place. A manufacturer with no vehicle does not benefit from the rush.
The rule behind itEvery five years, by contract
Supply schedule contracts run a base period with option periods after it. Renewal is not automatic and it is not silent — pricing, terms and commercial-practice disclosures are all revisited. If you hold one, the work starts long before the letter arrives.
The rule behind itAnnually, on your registration anniversary
It lapses if you do not renew, and a lapsed registration means the government cannot pay you — including on contracts you already hold. It is the most avoidable self-inflicted wound in the channel and it happens constantly.
The rule behind it02Where the calendar stops being a calendar
Agencies operate under a continuing resolution, which typically holds spending near prior-year levels and discourages new starts. It compresses and delays the pattern above rather than removing it — and it makes an existing vehicle worth more, not less, because continuing what is already in place is the path of least resistance.
No. Larger purchases are planned against a facility's own capital cycle and are decided earlier, so the late-year effect is strongest on supplies and replacement items. Selling a capital system on a September urgency argument is a tell that you have not done this before.
No. Some funds are multi-year or no-year and do not expire on the same schedule. Assuming every dollar in front of you expires on 30 September will make you sound confident and be wrong, which is the worst combination in front of a contracting officer.
03Your case
That is the instance version of this page, and it is what a seat buys — the specific awards in the product-service codes your device is bought under, when each one was signed, when its notice window opens, and who holds it. Start with the free verdict to find out whether you are in a position to act on one.